AT A GLANCE

  • Project Name: Duke Energy Railroad Embankment
  • Location: 10300 Gilead Rd, Huntersville, NC 28078, USA
  • Duration: 5 Months
  • Project Type: PrivateRail Projects
  • Status: Complete

Duke Energy Railroad Embankment

A $1.5 million, 5 month long project, consisting of reconstructing a previous rail car track for Duke Energy.

The existing embankment had developed sinkholes and settled, leaving the rail unable to support incoming rail car loads. The project consisted of 5 acres of clearing, the removal of approximately 29,000 cubic yards of unstable railroad embankment over a creek.  The existing embankment was replaced with 22,300 cubic yards of earth fill, 8,250 cubic yards of rock fill, and 5,800 cubic yards of reinforced fill.  The project also included preparing the rail subgrade and installation of sub ballast for the new rail.

Project Highlights

  • Clearing – 5 Acres
  • Erosion/Dewatering – 4 Mo
  • Rock Fill – 8,250 cy
  • Embankment – 22,690 cy
  • Reinforced Fill – 5,810 cy
  • Geotextile – 13,000 sy
  • Subballast – 430 cy